welcome to our other services gallery page

Below you will find a few of our Other services projects completed in detail with photo galleries. We hope you enjoy them and we look forward to hearing from you.

Living Room Refresh

 

These Are Some Of The Steps Taken On The Living Room Reno

 

  • The process starts with the potential client contacting us to schedule a meeting.
  • We meet to discuss your project needs.
  • We take notes, measurements, drawings if any and some pictures for reference to provide you with a detailed quote.
  • We then discuss the project outlines with a Professional Engineer or Designer.
  • The detailed drawings, though not always required or wanted as it’s an extra cost to your project, is a crucial part of permitting and ensuring a smooth endeavor.
  • Once the quote was accepted we created a detailed progress schedule from start to completion.
  • The client asked if we could move some of the bulkier items into their kitchen.
  • We had a dumpster delivered and started the demo of the room.
  • Once the room was demolished and all materials disposed of we vacuumed the area.
  • This was time sensitive as it was winter and all exterior insulation was removed.
  • We installed the new Rockwool® insulation, vapor barrier and taped all joints.
  • A few of the 2×8 floor joists had cracks in them so we had braced them with Simpson Strong Tie® hardware as per the Engineer.
  • We installed new sheathing on the floors with glue and screws.
  • An electrician we work with ran all new electrical to the room including flush mount LED’s and gimbal LED’s to showcase the fireplace.
  • Next we hung 5/8 fire code drywall.
  • The fun part of taping and mudding of the drywall begins. And happily ends!!
  • Paint all walls affected by the reno with a perfect match from Dulux®.
  • Add new crown mouldings, and custom doorway trims.
  • Doorway trims and jams were all pine, routered on site to the clients approved profile.
  • Paint all trims.
    Install the new brick veneer, hearth and mantle around the fireplace which was purchased from and installed by Napoleon®.
  • We then installed the customer chosen wire brushed, oak hardwood floors from Preverco®.
  • Installed the baseboard trim and painted it.
  • Project completed.
  • The client then reached out to us for assistance in hanging their newly purchased TV.
  • We were happy to oblige.
  • While onsite they asked about cabinets for either side of the fireplace.
  • We contacted a custom cabinet manufacturer that we know and he made the units to their desired specs.

Master Ensuite Reno

 

Here Are a few Of The Steps Taken On The Master Ensuite Reno

 

  • Stay tuned for more information regarding this project

Top secret

 

Don’t put off your project any longer. Contact us now to see what we can do for you.

We Strive To Provide The Best Service In Industry

Don’t wait any longer. Contact 2 Guys today.